A Case Study
EPCPROMAN software for Construction Management of the Kudankulam Nuclear Power Project
BHEL is one of the largest engineering and manufacturing companies of its kind in India engaged in design, engineering, construction, testing, commissioning and servicing of a wide range of products and services with over 180 product offerings to meet the ever-growing needs of the core sectors of economy.
Nuclear Power Corporation of India Limited (NPCIL) is a Public Sector Enterprise under the administrative control of the Department of Atomic Energy (DAE), Government of India. NPCIL is responsible for design, construction, commissioning and operation of nuclear power reactors. NPCIL requires Construction Management Software for Kudankulam Nuclear Power Project.
Contractor
Project Owner
Parascadd Private Limited successfully implemented EPCPROMAN software stage-wise for the Kundankulam Nuclear Power Project.
D. Sanath Kumar
Manager BHEL
We thank Parascadd Private Limited for successfully stage wise implementation of EPCPROMAN software for the Kundankulam Nuclear Power Projects.
K Rajashekar
PE(NP) NPCIL
The Client | BHEL(contractor), NPCIL(Owner)
BHEL is one of the largest engineering and manufacturing companies of its kind in India engaged in design, engineering, construction, testing, commissioning and servicing of a wide range of products and services with over 180 product offerings to meet the ever-growing needs of the core sectors of economy.
Nuclear Power Corporation of India Limited (NPCIL) is a Public Sector Enterprise under the administrative control of the Department of Atomic Energy (DAE), Government of India. NPCIL is responsible for design, construction, commissioning and operation of nuclear power reactors.
Their Requirements
- Equipment, Piping and Metal structure works
- Civil work activities such as Concreting, Reinforcement Steel works and Painting works
- Electrical works such as Cable laying, Panels erection and Termination works
- Instrumentation and Other ancillaries as per the requirement
Solution & Approach
- Installation and configuration of basic modules of Construction Management Software
- Equipment, Piping and Metal structure works (Material Receiving, Stock Control, Fabrication & Erection Progress, Welding & NDT Progress, Report generation, SOQR linking
- Civil work activities (Inventory Control, Reinforcement, Shuttering , Concreting & Painting reporting)
- Electrical works (Cable Structures, Cable laying, Termination, Panels Erection, Electrical Item Installation, SOQR Progress & Drum wise stock control)
- Instrumentation works (Light Channel Laying, Field instruments installation, Cable laying & Material Control)
Stage-wise Execution
- Stage – 1 : Installation and configuration of basic modules of Construction Management Software
- Stage – 2 : Release and acceptance of module-1 which shall include flow of activities pertaining to Equipment, Piping and Metal structure works (Material Receiving, Stock Control, Fabrication & Erection Progress, Welding & NDT Progress, Report generation, SOQR linking)
- Stage – 3 : Release and acceptance of module-2 which shall include flow of activities pertaining to Civil work activities (Inventory Control, Reinforcement, Shuttering , Concreting & Painting reporting)
- Stage – 4 : Release and acceptance of module-3 which shall include flow of activities pertaining to Electrical works (Cable Structures, Cable laying, Termination, Panels Erection, Electrical Item Installation, SOQR Progress & Drum wise stock control)
- Stage – 5 : Release and acceptance of module-4 which shall include flow of activities pertaining to Instrumentation works (Light Channel Laying, Field instruments installation, Cable laying & Material Control)