Manual Spool Marking on PDF Isometric drawings |
Automatic/Interactive/Rule based |
Manual Estimation of Spool wise MTO |
Automatic |
Manual Estimation of Erection MTO |
Automatic |
Manual preparation of various Construction Reports like Inch Dia (ID), Inch Meter (IM), Joint Summary etc. |
Automatic |
Manual compilation of Piping Materials like Pipes, Fittings, Flanges, Valves, Fasteners etc. against Isos |
Automatic |
Manual adaptation of Revisions if ISOs are revised |
Automatic/Interactive/Rule based |
Manual comparison of Old Isos / Old Fabricated Spools with Revised Isometrics and Processing |
Automatic/Interactive/Rule based |
Manual report preparation like Fit up Reports, Weld Visual, NDT Reports at Fabrication Yard |
Automatic/Interactive/Rule based |
Manual Spool Inspection and Release Report |
Automatic/Interactive/Rule based |
Manual report preparation like Fit up Reports, Weld Visual, NDT Reports at Erection Site |
Automatic/Interactive/Rule based |
Manual Mechanical Clearance Report |
Automatic/Interactive/Rule based |
Manual Loop Clearance Report |
Automatic/Interactive/Rule based |
Manual System Completion Report |
Automatic/Interactive/Rule based |
Manual Subcontractor Billing Preparation and Certification |
Automatic/Interactive/Rule based |
Manual Loop Drawing generation (for IBR submission) |
Automatic/Interactive/Rule based |
Manual estimation of Consumables / Manpower planning |
Automatic/Interactive/Rule based |
Manual Matching Front Analysis (MFA) against materials received (available/inspected at Stores) |
Automatic/Interactive/Rule based |
Manual Look Ahead Planning with respect to Material Take Off (MTO), Purchase Orders, Material Status Reports and Materials Receipt |
Automatic/Interactive/Rule based |
Manual Vendor Delivery / Expedition from Procurement to Construction |
Automatic/Interactive/Rule based |
Manual updating of Store inward and outward inventory items |
Automatic/Interactive/Rule based |
Manual Vendor Delivery / Expedition from Procurement to Construction |
Automatic/Interactive/Rule based |
Manual daily material stock updating and reconciliation of material (reconciliation at closure) |
Automatic/Interactive/Rule based (live reconciliation) |
Manual creating DMR (GRN) Daily material receipt |
Automatic/Interactive/Rule based |
Manual prioritizing the lines based on construction priority, Area, Inch Dia, Elevation etc. |
Automatic/Interactive/Rule based |
Manual calculation of pending material to be ordered for the priority line |
Automatic |
Manual activity related with all QA/QC and NDT progress monitoring. |
Automatic/Interactive/Rule based |
Manual creation of Line History Sheets |
Automatic |
Manual Painting completion progress of Spools(Fabrication) |
Automatic/Interactive/Rule based |
Manual Spool/Isometric/Loop/System Front clearance for Erection. |
Automatic/Interactive/Rule based |
Manual Creation of Punch Points and liquidation of the same. |
Automatic/Interactive/Rule based |
Manual creation of SCR/FCR (Site Change request and Field Change Request) |
Automatic/Interactive/Rule based |
Manual Revision Management – Maintaining weld nos. with respect to previous revisions, Cloud marking, Files management, addition/deletion/modifications of materials. |
Automatic/Interactive/Rule based |
Manual selection of joints for NDT test as per NDT Plan (Manual) |
Automatic/Interactive/Rule based |
Manual material control between Engineering to Procurement and Construction. |
Automatic/Interactive/Rule based |
Manual Spool Identification |
Automated Spool Identification through BARCODE / RFID |
Manual Spool Storage Location / Grid search |
Automated Spool Identification through BARCODE / RFID |
Manual Progress Reporting |
Automated real time Daily, Weekly, Monthly Progress Reports |
Manual checking of Welder Performance |
Automatic/Interactive Welder Performance Reports |
Manual Calculation of Percentage NDT coverage |
Automatic Line-wise/Welderwise NDT coverage report |
MTO Analysis and generating variance w.r.t previous MTO (generally not being done) |
Automatic (ensure optimization of Procurement) |
Manual Substitution of Surplus Piping Materials (leading to generation of Surplus) |
Automatic (ensure optimization usage of materials) |
Manual Offloading of scope of work (time taking and scope not getting defined properly) |
Automatic (scope can be segregated without loss of time and with no ambiguity) |
Manual Codification of Items (with no proper logic and intelligence) |
Automatic / Rule based (highly intelligent), applicable for all types of items, be it Piping, Structural, Elect. / Instruments) |
Manual Work Front Calculations for on-going and future activities (not integrated) |
Automatic (accuracy in present and future Work Front calculations with assessment of Manpower & Machineries) |
Manual Preparation of Hydro test Pack |
Automatic |