PDIM

Advanced Work packages & Colour based
Construction Simulation (3D-4D-5D) – Made Easy

Full Specifications

Overview

Packages Dynamic information modelling  Software for Creation, monitoring, progress tracking of Advanced Work Packages containing Construction Work Packages with associated Engineering Work packages & Procurement Work Packages.

Facilitated with Construction sequencing & progress color representation on 3D model components for precise progress visualization with dashboards at Project Level drilled down to CWP/EWP/PWP level.

Audience

  • Planning Managers/Engineers – Work face Planners, Work face Coordinators
  • Project Managers, Construction Managers, Engineering Managers, Procurement Managers, Construction Leads-All discipline, Lead Engineers -All discipline.

Key Features of PDIM

Benefits of PDIM

Workflow

Workflow for Creation of STRUCTURAL JOBCARDS

Watch PDIM in Action

PDIM Brochure

Discover the Impact of Construction Simulation Software on Construction Planning, 3D Graphics, and Color-Coded Construction Sequencing

Product Specialities

4D Simulation
4D Simulation
5D Simulation

4D Simulation (Timelines) in PDIM

5D Simulation (Cost) in PDIM

Enhance Your Construction Sequence Planning with Our Constructability Module

Our Constructability  software designed to streamline construction sequencing for work packages and units. Utilizing an intuitive 3D graphical interface, it efficiently manages the intricate relationships between various items, ensuring a smoother construction process.

Watch PDIM in Action

PDIM Brochure

Discover the Impact of Construction Simulation Software on Construction Planning, 3D Graphics, and Color-Coded Construction Sequencing

PDIM Workflow

Create Work Packages
1

Create Work Packages

Work Packages are created for Construction monitoring eg:- SKID1, Mezzanine Deck, Module, Area etc.

Assign Items of Work Package from Model
2

Assign Items of Work Package from Model

Tags/Items/Components from Engineered 3D graphical model are assigned to the relevant work packages.

integration
3

Sequencing Items as per Construction & Qualification as per specific UOM

Tags/Items assigned to Work Packages are sequenced as per Construction order . Scope Quantity of each item with relevant UOM is captured in system for further monitoring

dependencies between items
4

Establish Dependencies Between Items/Activities

Identify the relationships / dependencies of all the items in the Work Packages

Piping 3D work progress representation
5

Capturing Progress Percetages & Colour Codes Representation

Progress percentages of each Item in the Work Packages is captured along with representative colour codes to reflect in model

Contractor Schedule
6

Identification of Work Front Opened Items

Work front for items in Work Packages are opened based on the progress completion of related items/activities

tender directory
7

Extraction of Reports & MTO from 3D Model

MTO is extracted at various hierarchical level from the 3D model for all disciplines along with properties/attributes of the model

See The Product in Action

Discover PARASCADD's PDIM software, to know how it can assist you to empower your business.