Tecnimont HPCL (PP & HDPE)
| Project | : Tecnimont HPCL (PP & HDPE) |
| Client / Owner | : Tecnimont ICB |
| Location | : Poland |
| Total Scope | : 12000 |
| Production Rate | : 400 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
LUKOIL_K293 & K294
| Project | : LUKOIL_K293 & K294 |
| Client / Owner | : KT KineticsTechnology S.p.A |
| Location | : Poland |
| Total Scope | : 13500 |
| Production Rate | : 600 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
LUANDA REFINERY
| Project | : K356 LUANDA REFINERY,GASOLINE |
| Client / Owner | : KT KineticsTechnology S.p.A |
| Location | : Luanda, Angola |
| Total Scope | : 4000 |
| Production Rate | : 3000 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
K371 RIJEKA REFINERY UPGRADE PROJECT
| Project | : K371 RIJEKA REFINERY UPGRADE PROJECT |
| Client / Owner | : KT KineticsTechnology S.p.A |
| Location | : Rijeka, Croatia |
| Total Scope | : 13500 |
| Production Rate | : 600 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
SALALH LPG FZC
| Project | : SALALH LPG FZC |
| Client / Owner | : PETROFAC |
| Location | : Oman |
| Total Scope | : 12086 |
| Production Rate | : 450 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
SAKAHLIN-2 OPF COMPRESSION
| Project | : SAKAHLIN-2 OPF COMPRESSION |
| Client / Owner | : PETROFAC |
| Location | : Russia |
| Total Scope | : 5600 |
| Production Rate | : 360 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
JI-2042 MAJNOON,IRAQ
| Project | : JI-2042 MAJNOON,IRAQ |
| Client / Owner | : PETROFAC |
| Location | : Iraq |
| Total Scope | : 5000 |
| Production Rate | : 200 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
Qusahwira field development phase II
| Project | : Qusahwira field development phase II |
| Client / Owner | : PETROFAC |
| Location | : Abu Dhabi |
| Total Scope | : 18500 |
| Production Rate | : 400 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
HPCL-Vizag
| Project | : HPCL-Vizag |
| Client / Owner | : PETROFAC |
| Location | : Visakhapatnam |
| Total Scope | : 21000 |
| Production Rate | : 400 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
EPC FOR BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT
| Project | : BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT |
| Client / Owner | : Target Tr Abu Dhabi |
| Location | : Abu Dhabi |
| Total Scope | : 10000 |
| Production Rate | : 400 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
HMEL BHATINDA INDIA EIL (BSVI)
| Project | : HMEL BHATINDA INDIA EIL (BSVI) |
| Client / Owner | : EIL |
| Location | : Bhatinda, Gujrat |
| Total Scope | : 6700 |
| Production Rate | : 330 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
TECHNIP FMC INDIA-EPCC5-VIZAG
| Project | : TECHNIP FMC INDIA-EPCC5-VIZAG |
| Client / Owner | : TECHNIP |
| Location | : Visakhapatnam |
| Total Scope | : 3000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
ATCO (Farabi Petrochemical Project, Yanbu)
| Project | : ATCO (Farabi Petrochemical Project) |
| Client / Owner | : L & T |
| Location | : Yambu, Saudi Arabia |
| Total Scope | : 2000 |
| Production Rate | : 280 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
ATCO (Haliba project)
| Project | : ATCO (Haliba project) |
| Client / Owner | : TECHNIP |
| Location | : Abu Dhabi |
| Total Scope | : 800 |
| Production Rate | : 280 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
Zirku Facilities Capacity Enhancement project (TRAIN-5)
| Project | : Zirku Facilities Capacity Enhancement project |
| Client / Owner | : C C C |
| Location | : Zirku, Abu Dhabi |
| Total Scope | : 1000 |
| Production Rate | : 150 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
Dodsal Engineering & consrtuction FZE
| Project | : Dodsal Engineering & consrtuction FZE |
| Client / Owner | : DODSAL |
| Location | : Dubai, UAE |
| Total Scope | : 5000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
APPOMATTOX
| Project | : APPOMATTOX |
| Client / Owner | : KIEWIT |
| Location | : Louisiana, USA |
| Total Scope | : 8000 |
| Production Rate | : 400 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
SP89E EXPANSION
| Project | : SP89E EXPANSION |
| Client / Owner | : DODSAL |
| Location | : Ingleside, Texas |
| Total Scope | : 5000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
PEREGRINO II
| Project | : PEREGRINO II |
| Client / Owner | : KIEWIT |
| Location | : Campos basin, Brazil |
| Total Scope | : 4000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
TVA ALLEN
| Project | : TVA ALLEN |
| Client / Owner | : KIEWIT |
| Location | : Memphis, Tennessee |
| Total Scope | : 3000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
Acrylic/Oxo alcohol Project
| Project | : Acrylic/Oxo alcohol Project |
| Client / Owner | : Tecnimont ICB |
| Location | : Dumad, Gujarat |
| Total Scope | : 9000 |
| Production Rate | : 500 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
IGD EXPANSION PHASE II (IGDE2) PROJECT
| Project | : IGD EXPANSION PHASE II (IGDE2) PROJECT |
| Client / Owner | : Target Tr Abu Dhabi |
| Location | : Abu Dhabi |
| Total Scope | : 5000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
CDU/VDU WITH HOT WELL OFF GAS TREATMENT UNIT
| Project | : CDU/VDU WITH HOT WELL OFF GAS TREATMENT |
| Client / Owner | : Tata Projects Limited |
| Location | : Bargarh, Odisha |
| Total Scope | : 25000 |
| Production Rate | : 600 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
EPCC-04 PACKAGE-DCU WITH UNSATURATED LPG TREATING UNIT
| Project | : EPCC-04 PACKAGE-DCU WITH UNSATURATED LPG TREATING UNIT |
| Client / Owner | : Tata Projects Limited |
| Location | : Barmer, Rajasthan |
| Total Scope | : 17000 |
| Production Rate | : 500 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
EPCC-10 PACKAGE-VGO HDT ROGPSA UNIT
| Project | : EPCC-10 PACKAGE-VGO HDT ROGPSA UNIT |
| Client / Owner | : Tata Projects Limited |
| Location | : Barmer, Rajasthan |
| Total Scope | : 11000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
JI-2046
| Project | : JI-2046 |
| Client / Owner | : Petroleum Development Oman |
| Location | : Barmer, Rajasthan |
| Total Scope | : 15000 |
| Production Rate | : 150 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
Irkutsk Polymer Plant (IPP) Ethylene Cracker Unit
| Project | : Irkutsk Polymer Plant (IPP) Ethylene Cracker Unit |
| Client / Owner | : FORTRESS ENERGY TECHNOLOGY |
| Location | : Russia |
| Total Scope | : 5000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
EPCM SERVICES FOR PX & PTA EXPANSION
| Project | : EPCM SERVICES FOR PX & PTA EXPANSION |
| Client / Owner | : Indian Oil |
| Location | : Panipat, Haryana |
| Total Scope | : 15000 |
| Production Rate | : 150 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
BR-9 EXPANSION PROJECT IOCL BARAUNI, INDIA
| Project | : BR-9 EXPANSION PROJECT IOCL BARAUNI |
| Client / Owner | : Tecnimont |
| Location | : Barauni, Bihar |
| Total Scope | : 6000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
1. MEG REGENERATION PACKAGE 2. K439 3. P2111_749
| Project | : 1. MEG REGENERATION PACKAGE 2. K439 3. P2111_749 |
| Client / Owner | : NextChem |
| Location | : Russia |
| Total Scope | : 1500 |
| Production Rate | : 150 |
| Scope of Services | : Piping Spooling Service |
| Status | : Completed |
Ongoing Projects
BOROUGE 4300_PO
| Project | : BOROUGE 4300_PO |
| Client / Owner | : Tecnimont |
| Location | : Abu Dhabi |
| Total Scope | : 27000 |
| Production Rate | : 600 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
BOROUGE 4300_U & O
| Project | : BOROUGE 4300_U & O |
| Client / Owner | : Tecnimont |
| Location | : Abu Dhabi |
| Total Scope | : 12000 |
| Production Rate | : 350 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
Lu Pech (J-18) IOCL GUJARAT REFINERY
| Project | : Lu Pech (J-18) IOCL GUJARAT REFINERY |
| Client / Owner | : Tata Projects Limited |
| Location | : Vadodara, Gujarat |
| Total Scope | : 20000 |
| Production Rate | : 500 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
1.2 MMTPA PX-PTA PROJECT (PARAXYLENE (PX)
| Project | : 1.2 MMTPA PX-PTA PROJECT (PARAXYLENE (PX) |
| Client / Owner | : Tecnimont |
| Location | : Odisha, India |
| Total Scope | : 20000 |
| Production Rate | : 500 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
K420 KT (HBO Project LOTOS Oil Sp. z o.o.)
| Project | : K420 KT (HBO Project LOTOS Oil Sp. z o.o.) |
| Client / Owner | : Kinetics Technology |
| Location | : Poland |
| Total Scope | : 15000 |
| Production Rate | : 600 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
RESIDUE HYDROCRACKING UNIT (RHCU)
| Project | : RESIDUE HYDROCRACKING UNIT (RHCU) |
| Client / Owner | : PETROFAC |
| Location | : Lithuania |
| Total Scope | : 23000 |
| Production Rate | : 700 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
Panipat Refinery Expansion project (P25)
| Project | : Panipat Refinery expansion project (P25) |
| Client / Owner | : TOYO ENGINEERING |
| Location | : Panipat, Haryana |
| Total Scope | : 18000 |
| Production Rate | : 600 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
NEOM Green Hydrogen Elements
| Project | : NEOM Green Hydrogen Elements |
| Client / Owner | : C C C |
| Location | : Oxagon, Neom |
| Total Scope | : 20000 |
| Production Rate | : 500 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
11 PATTERNS WELL HOOK-UP AND ASSOCIATED WORKS, NORTH KUWAIT
| Project | : 1 PATTERNS WELL HOOK-UP AND ASSOCIATED WORKS |
| Client / Owner | : Gulf Spic |
| Location | : Kuwait |
| Total Scope | : 22000 |
| Production Rate | : 1200 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
Borouge 4 Project - EPC Pacakge 5 - XLPE2 Unit- Ruwais, UAE
| Project | : Borouge 4 Project – EPC Pacakge 5 – XLPE2 Unit |
| Client / Owner | : Borouge |
| Location | : Ruwais, UAE |
| Total Scope | : 5000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
PETROCHEMICAL AND LUBE INTEGRATION PROJECT (J-18)
| Project | : PETROCHEMICAL AND LUBE INTEGRATION PROJECT (J-18) |
| Client / Owner | : NUBERG ENGINEERING LTD. |
| Location | : Vadodara, Gujarat |
| Total Scope | : 10000 |
| Production Rate | : 300 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
NUMALIGARH REFINERY EXPANSION PROJECT
| Project | : NUMALIGARH REFINERY EXPANSION PROJECT |
| Client / Owner | : FABTECH |
| Location | : Odisha |
| Total Scope | : 5000 |
| Production Rate | : 350 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
MIBC, MIBK AND U & O FACILITIES, DAHEJ, GUJRAT, INDIA.
| Project | : MIBC, MIBK AND U & O FACILITIES |
| Client / Owner | : EIL |
| Location | : Dahej, Gujrat |
| Total Scope | : 6000 |
| Production Rate | : 250 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
BR-9 RFCC REVAMP PROJECT, BARAUNI REFINERY
| Project | : BR-9 RFCC REVAMP PROJECT, BARAUNI REFINERY |
| Client / Owner | : L & T HYDROCARBON |
| Location | : Barauni |
| Total Scope | : 3000 |
| Production Rate | : 200 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
SAUDI ARABIAN OIL COMPANY (JAFURAH,SAUDI ARABIA)
| Project | : SAUDI ARABIAN OIL COMPANY |
| Client / Owner | : L & T HYDROCARBON |
| Location | : Jafurah, Saudi Arabia |
| Total Scope | : 9500 |
| Production Rate | : 350 |
| Scope of Services | : Piping Spooling Service |
| Status | : Ongoing |
BR-9 RFCC REVAMP PROJECT, BARAUNI REFINERY
Project : BR-9 RFCC REVAMP PROJECT, BARAUNI REFINERY
Client / Owner : L & T HYDROCARBON 
Location : Dahej
Total Scope : 3000
Production Rate : 200
Scope of Services : Piping Spooling Service
Status : Ongoing
| SL No. | Organization | Project Name | Total Scope (No. of Isometrics) | Production Rate (No. of Isometrics / Week) | Status |
|---|---|---|---|---|---|
| 1 | Technimont ICB![]() |
K371 RIJEKA REFINERY UPGRADE PROJECT | 12000 | 400 | Completed |
| 2 | KT KineticsTechnology ![]() |
LUKOIL_K293 & K294 | 13500 | 600 | Completed |
| 3 | PETROFAC ![]() |
JI-2033 SALALH LPG FZC | 12086 | 500 | Completed |
| 4 | PETROFAC ![]() |
JI-2036 SAKAHLIN-2 OPF COMPRESSION | 5600 | 350 | Completed |
| 5 | PETROFAC ![]() |
JI-2042 MAJNOON,IRAQ | 5000 | 200 | Completed |
| 6 | Target Tr Abu Dhabi ![]() |
EPC FOR BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT | 10000 | 400 | Completed |
| 7 | EIL![]() |
HMEL BHATINDA INDIA EIL (BSVI) | 6700 | 330 | Completed |
| 8 | TECHNIP![]() |
TECHNIP FMC INDIA-EPCC5-VIZAG | 3000 | 300 | Completed |
| 9 | L & T![]() |
ATCO (Farabi Petrochemical Project, Yanbu, KSA) | 2000 | 250 | Completed |
| 10 | L & T![]() |
ATCO (Haliba project) | 800 | 100 | Completed |
| 11 | C C C![]() |
Zirku Facilities Capacity Enhancement project (TRAIN-5) | 1000 | 150 | Completed |
| 12 | DODSAL![]() |
Dodsal Engineering & consrtuction FZE | 5000 | 300 | Completed |
| 13 | KIEWIT![]() |
APPOMATTOX | 8000 | 400 | Completed |
| 14 | KIEWIT![]() |
SP89E EXPANSION | 6000 | 300 | Completed |
| 15 | KIEWIT![]() |
PEREGRINO II | 4000 | 300 | Completed |
| 16 | KIEWIT OFFSHORE SERVICES![]() |
TVA ALLEN | 3000 | 300 | Completed |
| 17 | KT KineticsTechnology S.p.A![]() |
K371 RIJEKA REFINERY UPGRADE PROJECT | 19000 | 600 | Ongoing |
| 18 | KT KineticsTechnology S.p.A![]() |
K356 LUANDA REFINERY,GASOLINE PRODUCTION INCREASE | 4000 | 300 | Ongoing |
| 19 | Tecnimont ICB![]() |
Acrylic/Oxo alcohol Project | 12000 | 500 | Ongoing |
| 20 | Target Tr Abu Dhabi![]() |
IGD EXPANSION PHASE II (IGDE2) PROJECT | 5000 | 300 | Ongoing |
| 21 | Tata Projects Limited![]() |
K356 CDU/VDU WITH HOT WELL OFF GAS TREATMENT UNIT | 25000 | 600 | Ongoing |
| 22 | Tata Projects Limited![]() |
EPCC-04 PACKAGE-DCU WITH UNSATURATED LPG TREATING UNIT | 30000 | 500 | Ongoing |
| 23 | Tata Projects Limited![]() |
EPCC-10 PACKAGE-VGO HDT ROGPSA UNIT | 17000 | 300 | Ongoing |
| 25 | PETROFAC![]() |
Qusahwira field development phase II | 19000 | 400 | Ongoing |
| 26 | PETROFAC![]() |
HPCL-Vizag | 21000 | 400 | Ongoing |
| 27 | Tecnimont ICB![]() |
1.2 MMTPA PX-PTA PROJECT | 25000 | 300 | Ongoing |
| 28 | TOWELL ENGINEERING OMAN![]() |
JI-2046 | 1500 | 150 | Ongoing |
| 29 | FORTRESS ENERGY TECHNOLOGY ![]() |
Irkutsk Polymer Plant (IPP) Ethylene Cracker Unit | 5000 | 300 | Ongoing |
| 30 | L & T![]() |
EPCM SERVICES FOR PX & PTA EXPANSION, PANIPAT | 1500 | 150 | Ongoing |